<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	>

<channel>
	<title>PMP Associates Civil Engineering</title>
	<atom:link href="http://www.pmpassoc.com/new-england-civil-engineering-blog/?feed=rss2" rel="self" type="application/rss+xml" />
	<link>http://www.pmpassoc.com/new-england-civil-engineering-blog</link>
	<description>New England Civil Engineering Blog</description>
	<pubDate>Sat, 31 Jul 2010 14:55:57 +0000</pubDate>
	<generator>http://wordpress.org/?v=2.7.1</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>How to design a Septic System - Understand the Sanitary Code</title>
		<link>http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=290</link>
		<comments>http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=290#comments</comments>
		<pubDate>Sat, 10 Jul 2010 13:44:19 +0000</pubDate>
		<dc:creator>Mike Perrault</dc:creator>
		
		<category><![CDATA[Septic Systems]]></category>

		<category><![CDATA[Add new tag]]></category>

		<category><![CDATA[civil engineering]]></category>

		<category><![CDATA[MassDEP]]></category>

		<category><![CDATA[Sanitary Code]]></category>

		<category><![CDATA[Sanitary Engineering]]></category>

		<category><![CDATA[Title 5]]></category>

		<guid isPermaLink="false">http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=290</guid>
		<description><![CDATA[Do you remember Mission Impossible? At the beginning of the program, the team is selected from the stack of available members. While the design of a septic system is not an impossible task, having the right "team" of system components should be the ultimate goal.]]></description>
			<content:encoded><![CDATA[<div style="float: right; width: 42px; padding-right: 10px; margin: 0 0 0 10px;"><script type="text/javascript">
<!--
digg_url = 'http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=290';
digg_bgcolor = '';
digg_skin = '';
digg_window = '';
digg_title = 'How to design a Septic System - Understand the Sanitary Code';
digg_bodytext = '';
digg_media = '';
digg_topic = '';
//-->
</script>
<script src="http://digg.com/tools/diggthis.js" type="text/javascript"></script>
</div>
<p>Since the late 1970&#8217;s, as a Civil Engineer, I have been involved with the design of Septic Systems, including the training of other young engineers.</p>
<p>If I was limited to only one piece of advice, it would be:</p>
<p style="text-align: center;">Understand the Sanitary Code!</p>
<p>In Massachusetts, the Sanitary Code was issued in 1978 under 310CMR15.00 and commonly called &#8220;Title 5&#8243;. A major revision took place in the mid 1990&#8217;s with further revisions during the last few years. In addition to the Code changes, the State has been issuing &#8220;policies&#8221; that clarify the Code and allow for the use of various &#8220;innovative and alternative&#8221; systems and components.</p>
<p>I have never subscribed to the &#8220;You can&#8217;t teach an old dog new tricks&#8221; mentality. As each Code revision is published, I and my staff of civil engineers become familiar with the changes and new requirements. As new technologies are approved (for both remedial and general use) we get technical data from these companies, including in-house demonstration seminars.</p>
<p>I can&#8217;t understand how a designer will insist on using a conventional pipe and stone leaching system when there are so many choices available that would reduce the cost of the system. Well, maybe I do understand, they either don&#8217;t want to change, or, they are cutting their costs &amp; fee and limiting the time spent on preparing the design plan. Some people like vanilla, but there are other flavors available and while you might pay a little more, there are added benefits in the long term.</p>
<p>Think of this as a round peg in a square hole. Depending on the size of the peg, you might be able to make it fit. But one size does not always fit all!</p>
<p>Do you remember Mission Impossible? At the beginning of the program, the team is selected from the stack of available members. While the design of a septic system is not an impossible task, having the right &#8220;team&#8221; of system components should be the ultimate goal.</p>
<p>In order to select the &#8220;team&#8221;, you need to understand the Code!</p>
]]></content:encoded>
			<wfw:commentRss>http://www.pmpassoc.com/new-england-civil-engineering-blog/?feed=rss2&amp;p=290</wfw:commentRss>
		</item>
		<item>
		<title>What&#8217;s the Buzz?</title>
		<link>http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=267</link>
		<comments>http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=267#comments</comments>
		<pubDate>Tue, 11 May 2010 12:50:36 +0000</pubDate>
		<dc:creator>Mike Perrault</dc:creator>
		
		<category><![CDATA[Commercial Land Development Planning & Engineering]]></category>

		<category><![CDATA[General Forum]]></category>

		<category><![CDATA[Residential Land Development Engineering]]></category>

		<category><![CDATA[Septic Systems]]></category>

		<category><![CDATA[Stormwater Management]]></category>

		<category><![CDATA[Uncategorized]]></category>

		<category><![CDATA[Wetlands Permitting]]></category>

		<category><![CDATA[municipal consulting]]></category>

		<category><![CDATA[Buzz]]></category>

		<category><![CDATA[Google]]></category>

		<guid isPermaLink="false">http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=267</guid>
		<description><![CDATA[<div style="float: right; width: 42px; padding-right: 10px; margin: 0 0 0 10px;"><script type="text/javascript">
<!--
digg_url = 'http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=267';
digg_bgcolor = '';
digg_skin = '';
digg_window = '';
digg_title = 'What&#8217;s the Buzz?';
digg_bodytext = '';
digg_media = '';
digg_topic = '';
//-->
</script>
<script src="http://digg.com/tools/diggthis.js" type="text/javascript"></script>
</div>

adderall

Yes, we are using Social Media marketing, or trying to, anyway.
First we were linking from Face Book and then we were Tweeting on Twitter.
We post our blogs on Hub Pages, comment on Yelp, Propeller &#38; Fluther.
Now we are using Google&#8217;s new &#8220;Buzz&#8221; application.
You can follow us using   pmp.associates.engineering@gmail.com
]]></description>
			<content:encoded><![CDATA[<div style="float: right; width: 42px; padding-right: 10px; margin: 0 0 0 10px;"><script type="text/javascript">
<!--
digg_url = 'http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=267';
digg_bgcolor = '';
digg_skin = '';
digg_window = '';
digg_title = 'What&#8217;s the Buzz?';
digg_bodytext = '';
digg_media = '';
digg_topic = '';
//-->
</script>
<script src="http://digg.com/tools/diggthis.js" type="text/javascript"></script>
</div>
<p><!-- ~~sponsor~~ --></p>
<div style="width: 150px; height: 1px; padding: 0px; font: 11px Tahoma; overflow: hidden;"><a href="http://www.sabinaguzzanti.it/">adderall</a></div>
<p><!-- ~~sponsored~~ --></p>
<p>Yes, we are using Social Media marketing, or trying to, anyway.</p>
<p>First we were linking from Face Book and then we were Tweeting on Twitter.</p>
<p>We post our blogs on Hub Pages, comment on Yelp, Propeller &amp; Fluther.</p>
<p>Now we are using Google&#8217;s new &#8220;Buzz&#8221; application.</p>
<p>You can follow us using   <strong>pmp.associates.engineering@gmail.com</strong></p>
]]></content:encoded>
			<wfw:commentRss>http://www.pmpassoc.com/new-england-civil-engineering-blog/?feed=rss2&amp;p=267</wfw:commentRss>
		</item>
		<item>
		<title>How to backfill a Septic Tank with style!</title>
		<link>http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=249</link>
		<comments>http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=249#comments</comments>
		<pubDate>Mon, 18 Jan 2010 20:56:09 +0000</pubDate>
		<dc:creator>Mike Perrault</dc:creator>
		
		<category><![CDATA[Septic Systems]]></category>

		<category><![CDATA[civil engineering]]></category>

		<category><![CDATA[Septic Tank]]></category>

		<guid isPermaLink="false">http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=249</guid>
		<description><![CDATA[A bagpiper was asked by a funeral director to play at a graveside service for a homeless man.]]></description>
			<content:encoded><![CDATA[<div style="float: right; width: 42px; padding-right: 10px; margin: 0 0 0 10px;"><script type="text/javascript">
<!--
digg_url = 'http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=249';
digg_bgcolor = '';
digg_skin = '';
digg_window = '';
digg_title = 'How to backfill a Septic Tank with style!';
digg_bodytext = '';
digg_media = '';
digg_topic = '';
//-->
</script>
<script src="http://digg.com/tools/diggthis.js" type="text/javascript"></script>
</div>
<div>
<p class="MsoNormal"><span style="font-family: Times New Roman; color: black; font-size: medium;"><span style="color: black; font-size: 14pt;">A bagpiper was asked by a funeral director to play at a graveside service for a homeless  man.  He had no family or friends, so the service was to be at a pauper&#8217;s  cemetery in a remote location in the country.</span></span></p>
<p class="MsoNormal"><span style="font-family: Times New Roman; color: black; font-size: medium;"><span style="color: black; font-size: 14pt;">The bagpiper was not familiar with the area, and got  lost. Being a typical man, he didn&#8217;t ask for directions. He finally arrived an  hour late, and saw the funeral director was already gone, and the hearse was  nowhere in sight. There were only the diggers and crew left, and they were  eating lunch.</span></span></p>
<p class="MsoNormal">
<div id="attachment_252" class="wp-caption alignleft" style="width: 290px"><img class="size-full wp-image-252" title="bagpiper" src="http://www.pmpassoc.com/new-england-civil-engineering-blog/wp-content/uploads/2010/01/bagpiper.jpg" alt="Bagpiper" width="280" height="280" /><p class="wp-caption-text">Bagpiper</p></div>
<p class="MsoNormal"><span style="font-family: Times New Roman; color: black; font-size: medium;"><span style="color: black; font-size: 14pt;">The bagpiper felt badly and apologized to the men for  being so late. He then went to the side of the grave and looked down and saw that the vault lid was  already in place. </span></span></p>
<p class="MsoNormal"><span style="font-family: Times New Roman; color: black; font-size: medium;"><span style="color: black; font-size: 14pt;">Not knowing what else to do, the bagpiper started to  play.</span></span></p>
<p class="MsoNormal"><span style="font-family: Times New Roman; color: black; font-size: medium;"><span style="color: black; font-size: 14pt;">The workers put down their lunches and  began to gather around. He played out his heart and soul for this man with no  family and friends. He played like he never played before for this homeless  man. As he played his last song, Amazing Grace, the workers all began to weep. </span></span></p>
<p class="MsoNormal"><span style="font-family: Times New Roman; color: black; font-size: medium;"><span style="color: black; font-size: 14pt;">When the bagpiper  finished, he packed up his bagpipes and started for his car with his head hung  low and heart full of emotion. </span></span></p>
<p class="MsoNormal"><span style="font-family: Times New Roman; color: black; font-size: medium;"></span></p>
<div id="attachment_254" class="wp-caption alignleft" style="width: 310px"><img class="size-medium wp-image-254" title="p064_asbuilt-002" src="http://www.pmpassoc.com/new-england-civil-engineering-blog/wp-content/uploads/2010/01/p064_asbuilt-002-300x225.jpg" alt="Septic Tank" width="300" height="225" /><p class="wp-caption-text">Septic Tank</p></div>
<p class="MsoNormal"><span style="font-family: Times New Roman; color: black; font-size: medium;"><span style="color: black; font-size: 14pt;">As he opened the door to his car, he heard one of the  workers say, &#8220;Sweet Mother, I never seen nothin&#8217; like that before and  I&#8217;ve been putting in septic tanks for over twenty  years.&#8221;</span></span></p>
<p class="MsoNormal"><span style="font-family: Times New Roman; color: black; font-size: medium;"><span style="color: black; font-size: 14pt;"><br />
</span></span></p>
<p class="MsoNormal"><span style="font-family: Times New Roman; color: black; font-size: medium;"><span style="color: black; font-size: 14pt;"><br />
</span></span></p>
</div>
]]></content:encoded>
			<wfw:commentRss>http://www.pmpassoc.com/new-england-civil-engineering-blog/?feed=rss2&amp;p=249</wfw:commentRss>
		</item>
		<item>
		<title>What qualities do you look for?</title>
		<link>http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=243</link>
		<comments>http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=243#comments</comments>
		<pubDate>Fri, 15 Jan 2010 21:03:36 +0000</pubDate>
		<dc:creator>Mike Perrault</dc:creator>
		
		<category><![CDATA[Septic Systems]]></category>

		<category><![CDATA[civil engineering]]></category>

		<category><![CDATA[Septic Tank]]></category>

		<category><![CDATA[Title 5]]></category>

		<guid isPermaLink="false">http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=243</guid>
		<description><![CDATA[You have finally decided that it is time to replace your old septic system. You have been told by the local Board of Health that you need to hire a Civil Engineer and a bunch of other stuff that you forgot as soon as you left the office. Your friends aren't much help either. What qualities do you look for when hiring a Civil Engineer?]]></description>
			<content:encoded><![CDATA[<div style="float: right; width: 42px; padding-right: 10px; margin: 0 0 0 10px;"><script type="text/javascript">
<!--
digg_url = 'http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=243';
digg_bgcolor = '';
digg_skin = '';
digg_window = '';
digg_title = 'What qualities do you look for?';
digg_bodytext = '';
digg_media = '';
digg_topic = '';
//-->
</script>
<script src="http://digg.com/tools/diggthis.js" type="text/javascript"></script>
</div>
<p>You have finally decided that it is time to replace your old septic system. You have been told by the local Board of Health that you need to hire a Civil Engineer and a bunch of other stuff that you forgot as soon as you left the office.</p>
<p>Your friends aren&#8217;t much help either.</p>
<p>What are the qualities that you are going to look for as part of your decision to hire a civil engineer?</p>
<p>Price?  Reputation? Knowledge? Recommendation? Local Firm?</p>
<p>Are you going to just hire a contractor and let him hire the engineer? oops! you may not want to do that, especially if you are concerned about the Price!</p>
<p>There is a regional furniture store that has a marketing jingle, &#8220;Quality, comfort and price, that&#8217;s nice&#8221;?</p>
<p>So tell me, what qualities do you look for?</p>
]]></content:encoded>
			<wfw:commentRss>http://www.pmpassoc.com/new-england-civil-engineering-blog/?feed=rss2&amp;p=243</wfw:commentRss>
		</item>
		<item>
		<title>Question - Should you have to pre-register to comment?</title>
		<link>http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=229</link>
		<comments>http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=229#comments</comments>
		<pubDate>Wed, 13 Jan 2010 17:42:24 +0000</pubDate>
		<dc:creator>Mike Perrault</dc:creator>
		
		<category><![CDATA[General Forum]]></category>

		<category><![CDATA[Uncategorized]]></category>

		<category><![CDATA[Civil Engineering blog]]></category>

		<guid isPermaLink="false">http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=229</guid>
		<description><![CDATA[Should you have to pre-register before you are allowed to comment on a blog? This question has caused a small debate in our office. So tell us your opinion!]]></description>
			<content:encoded><![CDATA[<div style="float: right; width: 42px; padding-right: 10px; margin: 0 0 0 10px;"><script type="text/javascript">
<!--
digg_url = 'http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=229';
digg_bgcolor = '';
digg_skin = '';
digg_window = '';
digg_title = 'Question - Should you have to pre-register to comment?';
digg_bodytext = '';
digg_media = '';
digg_topic = '';
//-->
</script>
<script src="http://digg.com/tools/diggthis.js" type="text/javascript"></script>
</div>
<p><strong>Should you have to pre-register before you are allowed to comment on a blog?</strong></p>
<p>This question has caused a small debate in our office.</p>
<p>If you don&#8217;t force the registration, then Spammers can take over the Blog and add trackback &amp; pingback links.</p>
<p>If you do allow instant access, then our readers will be able to post comments right away and see the comment post.</p>
<p><strong><span style="text-decoration: underline;">So tell us your opinion!</span></strong></p>
<p>Please use the &#8220;<span style="color: #0000ff;">no comments</span>&#8221; or &#8220;<span style="color: #0000ff;">comments</span>&#8221; link on the <em>posted in</em> line below.</p>
<p>You will be asked to fill in a name and e-mail (this notifies PMP that a comment has been posted) when you post your comment).</p>
<p>I have  adjusted the settings to allow your comments to be posted instantly.</p>
<p><strong>Results:</strong></p>
<p>The Russians are coming, the Russians are spamming! At least once a day I am deleting the spam!</p>
<p>I will still keep the restrictions off and hope that I catch &amp; delete all the spam crap.</p>
<p>I also want to thank all the ED product Spammers for visiting my Blogs and adding their links!  That gives me an opportunity to work on my blogs every day to delete your postings.</p>
<p>Wow! We are now getting about 15 ED related posting every night!  I have turned off the ability to comment on two blogs that seem to have attracted the attention of the spammers.</p>
<p>I am spending too much time deleting spam. I still want people to be able to post comments without pre-registering but I also want to control the publishing of the spam. You can still comment without pre-registering, but all posts will have to be approved before they are published, so I can delete the spam.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.pmpassoc.com/new-england-civil-engineering-blog/?feed=rss2&amp;p=229</wfw:commentRss>
		</item>
		<item>
		<title>&#8220;Do-it-yourself&#8221; Septic System Design</title>
		<link>http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=136</link>
		<comments>http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=136#comments</comments>
		<pubDate>Wed, 06 Jan 2010 17:16:12 +0000</pubDate>
		<dc:creator>Mike Perrault</dc:creator>
		
		<category><![CDATA[Septic Systems]]></category>

		<category><![CDATA[Add new tag]]></category>

		<category><![CDATA[civil engineering]]></category>

		<category><![CDATA[Sanitary Code]]></category>

		<category><![CDATA[Sanitary Engineering]]></category>

		<category><![CDATA[Septic Tank]]></category>

		<category><![CDATA[Title 5]]></category>

		<guid isPermaLink="false">http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=136</guid>
		<description><![CDATA[Having trouble with your Septic System? Can't take a shower and run the washing machine at the same time without having to clean-up a system back-up? You have a nice wet green area in your yard when the rest of the lawn is brown? Do you think it is time to replace the old Septic System?

Why not "do it yourself"?]]></description>
			<content:encoded><![CDATA[<div style="float: right; width: 42px; padding-right: 10px; margin: 0 0 0 10px;"><script type="text/javascript">
<!--
digg_url = 'http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=136';
digg_bgcolor = '';
digg_skin = '';
digg_window = '';
digg_title = '&#8220;Do-it-yourself&#8221; Septic System Design';
digg_bodytext = '';
digg_media = '';
digg_topic = '';
//-->
</script>
<script src="http://digg.com/tools/diggthis.js" type="text/javascript"></script>
</div>
<p>Having trouble with your Septic System? Can&#8217;t take a shower and run the washing machine at the same time without having to clean-up a system back-up? You have a nice wet green area in your yard when the rest of the lawn is brown? Do you think it is time to replace the old Septic System?</p>
<p style="text-align: center;"><strong>Why not &#8220;do it yourself&#8221;?</strong></p>
<p style="text-align: left;">While some of the following information could apply to other States, the focus of this Blog is to address residential septic systems in Massachusetts.</p>
<p style="text-align: left;">The first step is to understand what is a Septic System, which is also known as an on-site sanitary wastewater disposal system. The Massachusetts Department of Environmental Protection (MA DEP) maintains a website with lots of information. The trick is navigating through the site (link to the main <a href="http://www.mass.gov/dep/water/wastewater/septicsy.htm" target="_blank">DEP Septic System page</a>)  to find the answers you need. In Massachusetts, the design of septic systems is controlled by the State Sanitary Code (310 CMR 15.00) which is also known as Title 5 which can be obtained at this MA DEP <a href="http://www.mass.gov/dep/water/laws/regulati.htm#t5regs" target="_blank">Septic Systems/Title 5</a> link . Each community can also establish local regulations that have to be followed. You should check with the local Board of Health office.</p>
<p style="text-align: left;">Before you get started using the Code to do the design, let&#8217;s become familiar with the basic septic system components.</p>
<p style="text-align: left;">
<div id="attachment_135" class="wp-caption alignleft" style="width: 310px"><img class="size-medium wp-image-135" title="Septic Tank &amp; Pump Chamber_3_24_09" src="http://www.pmpassoc.com/new-england-civil-engineering-blog/wp-content/uploads/2010/01/q036_as-built_3_24_09-002-300x225.jpg" alt="Septic Tank &amp; Pump Chamber" width="300" height="225" /><p class="wp-caption-text">Septic Tank &amp; Pump Chamber</p></div>
<p style="text-align: left;">Sanitary wastewater leaves the house through the building sewer and flows by gravity into the Septic Tank. In some instances, the design requires a pump to move the septic tank effluent to the leaching system (also know as the soil absorption system or SAS)</p>
<p>The effluent leaving the septic tank and/or pump chamber has to be piped to a Distribution Box (&#8221;D&#8221; Box) before entering the SAS. The Distribution Box  is designed to allow the effluent to be distributed evenly into the leaching system by gravity (there are pressure dosed systems that do not use a &#8220;D&#8221; box).</p>
<div id="attachment_131" class="wp-caption alignleft" style="width: 310px"><img class="size-medium wp-image-131" title="Distribution Box_10-27-09" src="http://www.pmpassoc.com/new-england-civil-engineering-blog/wp-content/uploads/2010/01/r023_asbuilt_10-27-09-002-300x225.jpg" alt="Gravity Distribution Box with a force main inlet pipe" width="300" height="225" /><p class="wp-caption-text">Distribution Box with force main inlet pipe</p></div>
<p>Distribution boxes are typically made of concrete and are available with multiple pipe openings and sizes.</p>
<p>The SAS or &#8220;leaching area&#8221; allows the distributed effluent to pass into the ground.</p>
<p>There are multiple types of systems and components that have been approved for general use in the design of this system component. The decision to use a pipe and stone leaching field, pipe and stone leaching trench, chamber system or other type of system should be based on the specific site conditions and property constraints.</p>
<div id="attachment_132" class="wp-caption alignleft" style="width: 310px"><img class="size-medium wp-image-132" title="4 Row Arc36 Chamber Field_5_19_09" src="http://www.pmpassoc.com/new-england-civil-engineering-blog/wp-content/uploads/2010/01/q038_asbuilt_5_19_09-001-300x225.jpg" alt="No Aggregate Chamber Field" width="300" height="225" /><p class="wp-caption-text">No Aggregate Chamber Field</p></div>
<p>The MA DEP web site also published a series of technical design documents that are available at this <a href="http://www.mass.gov/dep/water/laws/policies.htm#t5guid" target="_blank">Guidance and Policy </a>link.</p>
<p>Now that you are more familiar with the systems components and have copies of the regulations, there are a few more steps that need to be accomplished before you can work on the design. You will need to prepare a plan of your property to show the existing house as well as the site features, such as the driveway, trees, swimming pool, etc. This plan needs to show your property line (your deed will describe your property and may even reference a plan that shows your lot lines). This plan also needs to show topography (your town may require the topography to be based on a national datum and not an assumed elevation) and spot elevations at certain locations.  It is also helpful to know the location and invert elevation of the building sewer pipe at foundation as well as the location of your water service and other utilities (gas, electric, CATV). If you or your neighbors have a well (drinking water and or irrigation well), then they (all the wells) also need to be located and shown on the plan.</p>
<div id="attachment_196" class="wp-caption aligncenter" style="width: 310px"><img class="size-medium wp-image-196" title="q038_topo_worksheet" src="http://www.pmpassoc.com/new-england-civil-engineering-blog/wp-content/uploads/2010/01/q038_topo_worksheet-300x231.jpg" alt="Topographic / Existing Conditions Plan" width="300" height="231" /><p class="wp-caption-text">Topographic / Existing Conditions Plan</p></div>
<p>Do you have wetlands within 100 feet of your property or where the new septic system would be installed? Then you will need to have the edge of the wetlands determined, located and shown on the plan. Some towns have local Wetlands By-laws &amp; Regulations which are more stringent that the State Regulations, so it may be best to contact your local Conservation Commission office.</p>
<p>Now that you have your worksheet plan, you can determine what area is available to locate the new septic system. The Code has a list of set-back distances that need to be followed, such as 10 ft. off the property line, etc.</p>
<p>The next step will require the services of a MA licensed Soil Evaluator to perform the official soil evaluation and percolation testing. This testing is witnessed by the local Board of Health and typically involves submitting an application along with a fee payment. The testing will involve the excavation of several deep (10 ft. plus) holes in the proposed system location, so you will need a larger backhoe.  You (or your excavating contractor) will need to obtain a &#8220;dig-safe&#8221; number and a Trench Permit (issued by the town).</p>
<div id="attachment_206" class="wp-caption alignleft" style="width: 310px"><img class="size-medium wp-image-206" title="deep_hole_excavator" src="http://www.pmpassoc.com/new-england-civil-engineering-blog/wp-content/uploads/2010/01/deep_hole_excavator-300x225.jpg" alt="Soil Evaluation" width="300" height="225" /><p class="wp-caption-text">Soil Evaluation</p></div>
<p>The soil evaluation will determine the depth and suitability of the soil, the elevation of the estimated seasonal high groundwater and the percolation rate. These items are all used in determining the elevation of the system components as well as the size of the SAS.</p>
<p>If you have a property that has high groundwater and the good soils are saturated (can&#8217;t perform the percolation test), then a soil sample can be taken to a State Certified Soils Lab to perform an analysis to determine the classification for establishing a percolation rate. This is only allowed for system replacement when no increase in flow is proposed.</p>
<p>Speaking of flow, the Code requires you to use a design flow based on the total number of bedrooms. If you have a house with more than 10 rooms, you are required to do a mathematical calculation to arrive at the bedroom count. The Code uses 110 gallons per day per bedroom with a three bedroom minimum design. Some towns require a higher design flow amount.</p>
<p>Now you can take all of this information and do the design for your septic system! The Code has a listing of all the items that must be presented on the design plan and some towns have additional content requirements.</p>
<p>In Massachusetts, the final design plans that are submitted to the Board of Health for approval must be prepared by a Registered Sanitarian or a Registered Professional Engineer.</p>
<p>Maybe the &#8220;do-it-yourself&#8221; method is not a good idea.</p>
<p>However, by knowing what is involved with this process and the multiple options for replacing a failed septic system, you can use this knowledge in hiring the Sanitarian or Professional Engineer who will work closely with you in preparing a final plan that is best suited for your property.</p>
<p style="text-align: left;">
<p style="text-align: left;">
<p style="text-align: left;">
]]></content:encoded>
			<wfw:commentRss>http://www.pmpassoc.com/new-england-civil-engineering-blog/?feed=rss2&amp;p=136</wfw:commentRss>
		</item>
		<item>
		<title>FACEBOOK&#8230;&#8230;..Yes we are on Facebook!</title>
		<link>http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=118</link>
		<comments>http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=118#comments</comments>
		<pubDate>Sun, 01 Nov 2009 15:38:09 +0000</pubDate>
		<dc:creator>Mike Perrault</dc:creator>
		
		<category><![CDATA[General Forum]]></category>

		<category><![CDATA[civil engineer]]></category>

		<category><![CDATA[Facebook]]></category>

		<category><![CDATA[Septic Systems]]></category>

		<guid isPermaLink="false">http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=118</guid>
		<description><![CDATA[P.M.P. Associates, LLC has two pages on Facebook. Become a fan and subscribe to the RSS feed.]]></description>
			<content:encoded><![CDATA[<div style="float: right; width: 42px; padding-right: 10px; margin: 0 0 0 10px;"><script type="text/javascript">
<!--
digg_url = 'http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=118';
digg_bgcolor = '';
digg_skin = '';
digg_window = '';
digg_title = 'FACEBOOK&#8230;&#8230;..Yes we are on Facebook!';
digg_bodytext = '';
digg_media = '';
digg_topic = '';
//-->
</script>
<script src="http://digg.com/tools/diggthis.js" type="text/javascript"></script>
</div>
<p>Do you do Facebook?   We do!</p>
<p>P.M.P. Associates, LLC has two pages:</p>
<p><a class="aligncenter" title="Civil Engineering &amp; Land Planning" href="http://www.facebook.com/home.php?#/pages/East-Bridgewater-MA/Civil-Engineering-Land-Planning-Consulting-by-PMP-Associates-LLC/36035443247?ref=sgm" target="_blank">Civil Engineering &amp; Land Planning by P.M.P. Associates, LLC </a></p>
<p>and</p>
<p><a class="aligncenter" title="Septic System Design" href="http://www.facebook.com/home.php?#/pages/East-Bridgewater-MA/Septic-System-Design-by-PMP-Associates-LLC/54178536552?ref=sgm" target="_blank">Septic System Design by P.M.P. Associates, LLC</a></p>
<p>Why not become a fan and also subscribe to the RSS feed?</p>
<p>All of the professional staff at P.M.P. Associates, LLC also have an individual presence on Facebook.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.pmpassoc.com/new-england-civil-engineering-blog/?feed=rss2&amp;p=118</wfw:commentRss>
		</item>
		<item>
		<title>Septic Systems - What your Real Estate Agent should know!</title>
		<link>http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=100</link>
		<comments>http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=100#comments</comments>
		<pubDate>Sat, 31 Oct 2009 20:48:58 +0000</pubDate>
		<dc:creator>Mike Perrault</dc:creator>
		
		<category><![CDATA[Septic Systems]]></category>

		<category><![CDATA[Real Estate]]></category>

		<category><![CDATA[Septic Tank]]></category>

		<category><![CDATA[Title 5]]></category>

		<guid isPermaLink="false">http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=100</guid>
		<description><![CDATA[What are you doing about your old Septic System?

If you have a septic system and live in Massachusetts, you are obligated by law to have your septic system inspected when you are selling your property.]]></description>
			<content:encoded><![CDATA[<div style="float: right; width: 42px; padding-right: 10px; margin: 0 0 0 10px;"><script type="text/javascript">
<!--
digg_url = 'http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=100';
digg_bgcolor = '';
digg_skin = '';
digg_window = '';
digg_title = 'Septic Systems - What your Real Estate Agent should know!';
digg_bodytext = '';
digg_media = '';
digg_topic = '';
//-->
</script>
<script src="http://digg.com/tools/diggthis.js" type="text/javascript"></script>
</div>
<p>By Michael E. Perrault, P.E.</p>
<p>How long has your house been on the market? That is a very common question, especially during this &#8220;economic slow down&#8221;.  Are you using a Real Estate firm to help you market and sell your property? What are you doing about your old Septic System?</p>
<p>If you have a septic system and live in Massachusetts, you are obligated by law to have your septic system inspected when you are selling your property. Before 1995 this requirement did not exist and typically only a token observation was performed. Opening the cover of the Septic Tank and proclaiming, &#8220;looks good to me&#8221; does not constitute a thorough inspection.</p>
<p>With the changes in the Massachusetts Sanitary Code since 1995, a licensed septic system inspector must follow the Title 5 Code requirements and document the inspection using the standard State forms. A copy of this completed form must be submitted to the local Board of Health office, the seller and a copy must also be provided to the buyer.</p>
<p>When you lsited your property, did your Real Estate Agent tell you about the need for the septic inspection? Did you have it done right away or are you waiting for a buyer?</p>
<p>Over the last 18 months I have been travelling to various real estate offices in Southeastern Massachusetts and presenting a brief seminar on septic systems. This seminar was pre-arranged to be made during the monthy meeting of the brokers, agents and sales staff and would take about 1/2 hour.</p>
<p>The focus of the presentation was on the need for the inspection of the septic system early in the sales process and what to do when the inspection results in a failure.</p>
<div id="attachment_105" class="wp-caption aligncenter" style="width: 310px"><img class="size-medium wp-image-105" title="Septic System Inspection" src="http://www.pmpassoc.com/new-england-civil-engineering-blog/wp-content/uploads/2009/10/290_elm_halifax_8_6_09-010-300x225.jpg" alt="Septic System Inspection" width="300" height="225" /><p class="wp-caption-text">Septic System Inspection</p></div>
<p>An important part of my presentation is the question and answer session.  One common question that is typically asked is, &#8220;My client&#8217;s septic system failed the Title 5 inspection, when do they need to replace the system?&#8221;</p>
<p>My advice is to have the work done sooner than latter.</p>
<p>What makes one property more attractive than a very similar property in the same neighborhood?  If both houses needed to have their septic systems replaced and one had all the engineering design completed and plans available for the buyer to review, would that make one house more attractive to a potential buyer?  Showing of the property would include telling the potential buyer exactly where the new septic system would be going and if it would involve building a large &#8220;hump: in the yard. What if the house had the system installed and the lawn restored. Would the completion of the work make that house even more attractive? The showing would simply indicate the location of the installed system and that there would be no delays due to the need to install a new septic system.</p>
<div id="attachment_106" class="wp-caption aligncenter" style="width: 310px"><img class="size-medium wp-image-106" title="Septic System Replacement" src="http://www.pmpassoc.com/new-england-civil-engineering-blog/wp-content/uploads/2009/10/q049_asbuilt_4-15-09-003-300x225.jpg" alt="New Replacement Septic Tank" width="300" height="225" /><p class="wp-caption-text">New Replacement Septic Tank</p></div>
<p>Some property owners simply do not have the money to pay for the design and installation of a new septic system. My advice is to suggest, as a minimum, getting the soil testing and desgin engineering completed as soom as possible. Once the design plans are completed, the owner can obtain actual construction cost estimates. The cost for replacing the septic system will play an important roll in establishing the acceptable price for the property.</p>
<p>As for the installation of the system, Banks and Mortgage Companies typically do not want to hold back funds at the &#8220;closing&#8221; to pay for the installation of the septic system. When they do agree to holding back the money to build the system, the amount is typically 1.5 times the bid estimate.</p>
<p>There are contractors that will work with sellers to install the replacement septic system when the sale documents are complete and the &#8220;closing&#8221;  has been scheduled, pending the installation of the septic system. These contractors are typically listed on the &#8220;closing documents&#8221; and are paid from the funds generated by the sale of the property.</p>
<p>Not all real estate professionals know about these options, have the contacts to get the engineering completed in a timely manner, obtain legitimate construction quotes or arrange for the &#8220;pre-closing&#8221; construction.</p>
<p>I hope that my &#8220;septic system seminar&#8221; for real estate professionals provided a little more knowledge. One other &#8220;tool&#8221; that was provided to these professionals was a copy of the brochure &#8220;Valuable Information on Title 5 Septic System, Perc. Testing, Soil Evaluation and Design Engineering&#8221;. This brochure clearly outlines the steps that need to be followed in replacing a faied septic system. This brochure can be downloaded for free from the www.pmpassoc.com web site landing page.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.pmpassoc.com/new-england-civil-engineering-blog/?feed=rss2&amp;p=100</wfw:commentRss>
		</item>
		<item>
		<title>Municipal Consulting - Roadway Construction</title>
		<link>http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=84</link>
		<comments>http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=84#comments</comments>
		<pubDate>Sun, 18 Oct 2009 16:03:41 +0000</pubDate>
		<dc:creator>Mike Perrault</dc:creator>
		
		<category><![CDATA[municipal consulting]]></category>

		<category><![CDATA[civil engineering]]></category>

		<category><![CDATA[Land Development]]></category>

		<category><![CDATA[Residential Land Development Engineering]]></category>

		<category><![CDATA[Subdivisions]]></category>

		<guid isPermaLink="false">http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=84</guid>
		<description><![CDATA[The process of converting land into residential house lots along new roads involves months of planning, engineering, permitting and construction.]]></description>
			<content:encoded><![CDATA[<div style="float: right; width: 42px; padding-right: 10px; margin: 0 0 0 10px;"><script type="text/javascript">
<!--
digg_url = 'http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=84';
digg_bgcolor = '';
digg_skin = '';
digg_window = '';
digg_title = 'Municipal Consulting - Roadway Construction';
digg_bodytext = '';
digg_media = '';
digg_topic = '';
//-->
</script>
<script src="http://digg.com/tools/diggthis.js" type="text/javascript"></script>
</div>
<p>The process of converting land into residential house lots along new roads involves months of planning, engineering, permitting and construction. When design plans are first submitted to a Planning Board, they typically are presented in a &#8220;preliminary plan&#8221; format to allow for initial comments that will guide the project toward the next step. Municipal consulting peer review services at this phase are just not confirming technical compliance with the Planning Board&#8217;s Regulations and local Zoning By-law requirements, but should also include suggestions for the Developer and his design professionals to follow in preparing the Definitive Subdivision Plan.</p>
<p>The Definitive Plan phase is where the more detailed engineering plans are presented to the Planning Board. The peer review at this step is to confirm that the plans meet the standards and regulations before they are approved.</p>
<p>Even with the approval of the Definitive Plan, the Developer still needs to obtain other permits associated with the project.  For example, the proposed roadway and lot development plan has to be submitted to the local electric &amp; telephone companies for the design of their utilities. If a site will disturb more than 1 acre, then a Notice needs to be filed with the EPA under the National Pollution Discharge Elimination System (NPDES) and a Storm Water Pollution Prevention Plan (SWPPP) prepared. Some properties, due to nearby wetlands, are within the jurisdiction of the local Conservation Commission and require permitting approval.</p>
<p>When the Developer decides to actually begin the construction of the roadway, notice is given to the local Planning Board and other local agencies. The Board&#8217;s consultant typically works closely with the Developer and the other local agencies to provide construction observation services during critical phases of this process. For the most part, these observation services are performed on an on-call / part-time basis to document the proper construction of the various project components.</p>
<p>Not every project moves quickly from start to finish. As an example, a small two-lot project in Abington Massachusetts required the construction of a short road with a Cul-de-Sac along with a stormwater management system as well as various utilities.</p>
<div id="attachment_80" class="wp-caption aligncenter" style="width: 310px"><img class="size-medium wp-image-80" title="f005_52_sign_10_14_09-2" src="http://www.pmpassoc.com/new-england-civil-engineering-blog/wp-content/uploads/2009/10/f005_52_sign_10_14_09-2-300x225.jpg" alt="Final Paving in Cul-de-Sac" width="300" height="225" /><p class="wp-caption-text">Final Paving in Cul-de-Sac</p></div>
<p>The original Developer started the project, constructed the new roadway improvements through the base course of pavement and then abandoned the project.</p>
<p>A new Developer purchases the subdivision after the project is left untouched for several years. Before this Developer begins working, a review is performed by the Planning Board&#8217;s engineering consultant to determine the condition of the project and prepares a list of the repairs, etc. that needs to be performed.</p>
<div id="attachment_81" class="wp-caption aligncenter" style="width: 310px"><img class="size-medium wp-image-81" title="f005_52_sign_10_14_09-4" src="http://www.pmpassoc.com/new-england-civil-engineering-blog/wp-content/uploads/2009/10/f005_52_sign_10_14_09-4-300x225.jpg" alt="Compacting Process for new pavement" width="300" height="225" /><p class="wp-caption-text">Compacting Process for new pavement</p></div>
<p>These repairs and long overdue maintenance items are performed by the new Developer and confirmed by the Board&#8217;s engineering consultant. Close coordination and communication at this phase of work is very important.</p>
<div id="attachment_82" class="wp-caption aligncenter" style="width: 310px"><img class="size-medium wp-image-82" title="f005_52_sign_10_14_09-5" src="http://www.pmpassoc.com/new-england-civil-engineering-blog/wp-content/uploads/2009/10/f005_52_sign_10_14_09-5-300x225.jpg" alt="Double curb inlet catch basin" width="300" height="225" /><p class="wp-caption-text">Double curb inlet catch basin</p></div>
<p>For this particular project, the Developer wanted to complete the majority of the required roadway construction before asking the Planning Board for the release of the two lots from the development &#8220;covenant&#8221;. Pavement activities are observed by the Board&#8217;s engineering consultant on a full-time basis since the proper placement and compaction are critical.</p>
<div id="attachment_83" class="wp-caption aligncenter" style="width: 310px"><img class="size-medium wp-image-83" title="f005_52_sign_10_14_09-7" src="http://www.pmpassoc.com/new-england-civil-engineering-blog/wp-content/uploads/2009/10/f005_52_sign_10_14_09-7-300x225.jpg" alt="Final Roadway Pavement" width="300" height="225" /><p class="wp-caption-text">Final Roadway Pavement</p></div>
<p>When a Definitive Subdivision in Massachusetts is approved and the plans are recorded at the Registry of Deeds, a signed &#8220;covenant&#8221; is also recorded. The covenant is a binding legal document (same term as in the Bible) that clearly states that the Developer can not sell the lots or get a building permit until he completes all of the construction improvements as shown on the subdivision plans. There is a provision to get a &#8220;release&#8221; from the covenant if the Developer is willing to post some form of surety to cover the costs for completing the project. One of the other duties of the Planning Board&#8217;s engineering consultant is to establish the list of outstanding construction items to create the &#8220;Bond Estimate&#8221; for the Board to use in determining the amount of the surety that the Developer must provide before he can get the formal release documents (which are also recorded at the Registry of Deeds).</p>
<p>The more work that is performed and completed by the Developer prior to the creation of the Bond Estimate results in a much lower surety amount.</p>
<p>The Developer of this project decided to install the final paving surface before the two houses are started. The Bond Estimate will include provisions for the repair of the pavement should damages occur.</p>
<p>At the end of the project, the final conditions will have to be observed by the Board&#8217;s consultant, necessary corrections and repairs made and confirmed before the Board can decide to release the surety.</p>
<p><em>(Since 1997,  Michael E. Perrault, P.E. and P.M.P. Associates, LLC has been providing professional consulting services to the Town of Abington Planning Board)</em></p>
]]></content:encoded>
			<wfw:commentRss>http://www.pmpassoc.com/new-england-civil-engineering-blog/?feed=rss2&amp;p=84</wfw:commentRss>
		</item>
		<item>
		<title>Municipal Consulting - Construction Observation Services</title>
		<link>http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=69</link>
		<comments>http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=69#comments</comments>
		<pubDate>Sun, 06 Sep 2009 01:11:31 +0000</pubDate>
		<dc:creator>Mike Perrault</dc:creator>
		
		<category><![CDATA[Commercial Land Development Planning & Engineering]]></category>

		<category><![CDATA[Add new tag]]></category>

		<category><![CDATA[municipal consulting]]></category>

		<category><![CDATA[peer review]]></category>

		<category><![CDATA[stormwater]]></category>

		<guid isPermaLink="false">http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=69</guid>
		<description><![CDATA[Municipal consulting services for Planning Boards are not limited to peer reviews. Some projects that are approved do require oversight during construction.]]></description>
			<content:encoded><![CDATA[<div style="float: right; width: 42px; padding-right: 10px; margin: 0 0 0 10px;"><script type="text/javascript">
<!--
digg_url = 'http://www.pmpassoc.com/new-england-civil-engineering-blog/?p=69';
digg_bgcolor = '';
digg_skin = '';
digg_window = '';
digg_title = 'Municipal Consulting - Construction Observation Services';
digg_bodytext = '';
digg_media = '';
digg_topic = '';
//-->
</script>
<script src="http://digg.com/tools/diggthis.js" type="text/javascript"></script>
</div>
<p>Municipal consulting services for Planning Boards are not limited to peer reviews. Some projects that are approved do require oversight during construction. The extent of the involvement of the Town on a private project is typically established in the project&#8217;s approval conditions. For example, the proper installation of the drainage system would be critical to the protection of the public, including down gradient abutters. In this instance, the Board would impose a condition that would require the developer / applicant to contact the Planning Board Consultant to view the drainage system installation.</p>
<div id="attachment_70" class="wp-caption alignleft" style="width: 522px"><img class="size-full wp-image-70" title="1238 Bedford St., Abington, MA" src="http://www.pmpassoc.com/new-england-civil-engineering-blog/wp-content/uploads/2009/09/f005_109_sep_1_2009__04.jpg" alt="In-ground stormwater system" width="512" height="384" /><p class="wp-caption-text">In-ground stormwater system in Abington, MA</p></div>
<p>By having the Board&#8217;s Consultant observe the installation, both the developer and the public will benefit. The developer has another professional viewing the construction to confirm that the developer is getting a properly installed system. The public has an independent paid professional confirming that the system is being properly installed.</p>
<p>Not every Town imposes these requirements.</p>
<p>Follow this link for more information regarding our <a title="Municipal Consulting Services" href="http://www.pmpassoc.com/municipal-engineering-consulting.htm" target="_blank">Municipal Consulting Services.</a></p>
]]></content:encoded>
			<wfw:commentRss>http://www.pmpassoc.com/new-england-civil-engineering-blog/?feed=rss2&amp;p=69</wfw:commentRss>
		</item>
	</channel>
</rss>
